Dublin International Airport

Dublin International Airport

Dublin International Airport Dublin, Ireland Institutional Area: 5,000sqm Cost: Undisclosed Scope of Work Point Cloud to BIM Description The baggage facility at Dublin Airport was a high-complexity project with busy interconnected layouts and services....
Ahmadi Cultural Center

Ahmadi Cultural Center

Al-Ahmadi Cultural Center Ahmadi, Kuwait Institutional Area: 60,000sqm Cost: KWD43M (USD 144M) Scope of Work LoD 300 Coordination Description AACC has a very unique facade cosisiting of doubly covered adaptive panels cladding....
Leicester University

Leicester University

Leicester University Leicester, UK Institutional Area: 11,000sqm Cost: Undisclosed Scope of Work Point Cloud to BIM Description A listed project in UK with very elaborate details....
Failaka Island Archeology Center

Failaka Island Archeology Center

Failaka Archeological Center Failaka Island, Kuwait Institutional Area: 3,300sqm Cost: KWD1.5M (USD 5M) Scope of Work LoD 200 LoD 300 LoD 400 Coordination Shop Drawings Quantity Extraction Description Located on the historical Failaka Island, this houses a museum,...